Before Christmas 2017, contractors were active in Leeming Bar yard beginning preparations for the erection of our new shed. These preparations involved digging holes in the sandy soil that Leeming Bar is built on and filling them with concrete to form foundation footings. A full gallery of images can be seen here

These photographs clearly show the width of the new shed which will accommodate two lines.

Further progress as the frame goes up and the cladding goes on


And it’s now ready for its first residents



The roller doors are now in place, guttering has been added and the second track has been installed and is being made ready for the concrete floor to be poured.






Photographs – Andy Glendinning, Alex Dudiak & WR Photo Archive